Busy, busy, busy! Three days reports in one here because of the rush to finish things off for the launch.
Much of the last three days has involved the final stages of completing The Container
before the launch. The techies have been finishing the installs and upgrades, whilst
everyone else has been frantically working to tidy The Container.
The final score on the computers is four Macs and ten PCs (and a server of course).
One of the PCs was actually given as a server for the network, but it was far too good
for that. Instead I used an old 350MHz Pentium II and now we now have an excellent Linux
multimedia desktop instead.
The last couple of days with the computers have been really difficult. By prioritising
the easiest systems to upgrade and install, it means we're now left with the really
difficult jobs. I had some trouble with the old P1 machines swapping cards and
chips until I found a configuration that worked. Lisa and Mile worked on the two
Compaq desktops (brought from Canada). They don't have an ordinary setup. Instead you
have to have a special program to change the internal setting which we didn't
have, and which we couldn't find on the Internet. But eventually we managed to get
working installations on both of them.
Much of the 29th was spent cabling The Container. Mostly this involved tidying up the
mains (complicated by the fact we have both 240V and 115V mains supplies) and the
network cabling. Most of this we trunked on the floor down the middle of the table
area. Then the whole place had a mega-clean-up. We chucked all the junk that had
accumulated during the conversion, and then cleaned out the dust.
Finally, full system power-up. We turned on every machine and made sure that they all
worked with the server. Then we let them run for a few hours to make sure they didn't
overheat (not a brilliant test because it had got dark by then). The power went off
which was also useful because we were able to check that everything recovered
well from a total crash.
Also, on the 29th, we had a spectacular display in the sky. There was a fiery ring
around the sun high-level ice crystals refracting light in the upper
atmosphere. I managed to get a few pictures, using my polarising shades to sharpen up
and darken the image enough to get a picture of it. The effect lasted for about three
hours.
About 1.30am on the 30th after many days of effort, hair-tairing and
excellent socialising we got home to Spanish Town ready for the launch.